What are the 17 key points of pneumatic conveying system design?

Source:http://www.ccgshp.cn/ Release time:2022-02-07 1Second

What are the 17 key points of pneumatic conveying system design?

In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 腐漫画在线| 亚洲国产欧美日韩| 美容美发2| porn精品国产| 超级毛片| 亚洲美女视频网| 成年视频国产免费观看| 国产v欧美v日韩在线观看| 福利一区二区在线观看| 免费国产一级特黄aa大片在线| 亚洲精品国产摄像头| vr欧美人成在线播放| 99精品视频在线观看免费专区| 欧美日韩操| 欧美精品人爱c欧美精品| 99在线观看视频| 99久久亚洲国产高清观看| 久青草免费在线视频| 四虎免费久久影院| 操久在线| 成人影院久久久久久影院| 福利一区三区| 银行标志图片大全| 国产一区二区三区日韩欧美| 国产jizzjizz视频全部免费| 91精品丝袜国产高跟在线一区| 中文字幕一区二区三区久久网站| 欧美亚洲国产专区在线app| 久久久全国免费视频| 亚洲不卡1卡2卡三卡2021麻豆| 国产精品三级| 免费中文字幕在线国语| 久久久久久久久综合影视网| 99久久综合狠狠综合久久| 国产不卡一卡2卡三卡4卡5卡在线| 国产一区2区3区| 国产91小视频| 免费一级毛片私人影院a行| 欧美成人免费xxx大片| 国产免费黄色片| 亚洲欧洲精品成人久久曰影片|